Thursday, December 1, 2011

Aerobridge tetap dibina di KLIA2

SEKALI LAGI KAMI INGIN MENGUCAPKAN TAHNIAH KEPADA MAHB YANG FAHAM PERASAAN OKU DAN BERANI DALAM MEMPERBETULKAN KEADAAN. TETAPI PERANGAI DEGIL AIR ASIA SUNGGUH MEMALUKAN YANG LANSUNG TIDAK BUAT APA YANG MEREKA CAKAP " NOW EVERYONE CAN FLY"  YANG HANYA MEMENTINGKAN KEUNTUNGAN



PROJEK pembangunan KLIA2 yang kini dalam pembinaan dan ia dijangka siap pada April 2013.




SEPANG - Malaysia Airport Holdings Bhd. (MAHB) akan tetap menyediakan kemudahan jambatan aero (aerobridge) di KLIA2 yang bakal menggantikan Terminal Penerbangan Tambang Murah (LCCT).
Meskipun menerima bantahan daripada sebuah syarikat penerbangan yang dikatakan enggan menggunakan kemudahan tersebut kerana dilihat bertentangan dengan model perniagaannya, Pengarah Urusan MAHB, Tan Sri Bashir Ahmad berkata, kemudahan tersebut merupakan satu keperluan.
"Saya bercakap bagi pihak golongan kelainan upaya (OKU), kanak-kanak, ibu mengandung dan warga emas bahawa aerobridge akan dipasang di KLIA2.
"Saya berharap syarikat penerbangan yang bakal menggunakan KLIA2 akan menyokong langkah ini demi kemudahan orang ramai," katanya pada sidang media sempena lawatan media di KLIA2 di sini semalam.



Wednesday, November 30, 2011

New, better KLIA2 takes wings

Brave decision by MAHB…..Air Asia your cooperation is compulsory as we wish not to protest against you ONE MORE TIME !!!!!  Please honor you words as MONEY is not everything


 Work in progress: Construction works are ongoing at KLIA2 in Sepang. The new low cost terminal will be equipped with facilities to cater to passenger comfort, including a public shopping mall, once it is completed.

SEPANG: Improvements have been made to KLIA2’s design because “it does not mean that a person who travels on a low-cost carrier need not arrive or depart from a very nice terminal”, said Malaysia Airports Holdings Berhad (MAHB) chief.

Its managing director and CEO Tan Sri Bashir Ahmad added that in view of public appeals – especially by people with restricted movements, the elderly, expectant mothers and children – aerobridges would be installed at KLIA2.

“We hope the airlines operating at KLIA2 will support our decision by using the aerobridges to meet the needs of the travelling public,” said Bashir at a press conference yesterday.

He added that the airport operator would go ahead with the building of aerobridges (to connect airplanes to the terminal gate) despite the refusal of a low-cost airline to use them.

When the new low-cost terminal is completed, it will be equipped with facilities to cater to passenger comfort, including a public shopping mall and a fully automated baggage handling system.

Other facilities are an airside transit hotel, premium lounges, as well as a seven-storey parking lot which will be able to accommodate up to 6,000 vehicles.

Bashir said KLIA2 had been significantly upgraded in terms of floor space, the length of its runways and the number of aircraft stands.

All these improvements resulted in an increase of the terminal’s building cost from a provisional budget of RM2bil to between RM3.6bil and RM3.9bil.

The upgrade of the baggage system to a fully automated one had also resulted in the delay of the terminal’s estimated date of completion from October next year to April 2013.

However, Bashir insisted that the cost of the terminal, estimated at RM5,000 per sq m, would be among the lowest compared to other similar airport terminal projects.

“The industry standard is within the range of RM5,000 to RM10,000 per sq m,” he said.

Bashir also said the passenger service charge for KLIA2 would remain the same as the current tax imposed at the low-cost-carrier terminal (LCCT).

When the terminal is completed, it will be made accessible via the Express Rail Link (ERL), taxis, buses and in the future, even via the KTM.

The terminal will have the capacity to serve up to 45 million passengers annually. This is three times the capacity of the main KLIA terminal.

KLIA2 to cost RM3.9 bln, ready by April 2013


VICTORY AT LAST 


KUALA LUMPUR (Nov 29): The upgrading of facilities at KLIA2 are expected to increase the total cost to build the airport to RM3.9 billion and it would be operational by April 2013.

Its managing director Tan Sri Bashir Ahmad said the KLIA2 would enable MAHB to handle about 45 million passengers yearly compared with the earlier estimate of 30 million.

In a statement to Bursa Malaysia, MAHB said the KLIA2 would have a “larger terminal footprint now standing at 257,000 sq metres, 68 contact stands and enhanced systems in place”.

The airports operator said KLIA2 is one of the largest privately funded projects and will spur the local economic growth and employment opportunities.

MAHB said KLIA2 is built as a national infrastructure asset to cater to the needs of the airlines, government, public and the airport.

It also said due to the appeals by the public especially people with restricted movements, elderly people, expectant mothers, and children, MAHB said aerobridges would be installed at KLIA2.

“As the cost works out to be only 25 sen per passenger, the public has indicated that they are willing to pay for the use of aerobridges,” it said.

Tuesday, November 29, 2011

KLIA2 to start operations in Apr 2013

VICTORY AT LAST



SEPANG: The Kuala Lumpur International Airport 2 (KLIA 2), the new low cost carrier terminal, will handle 45 million passengers when it commences operations in April 2013, says Malaysia Airports Holdings Bhd managing director Tan Sri Bashir Ahmad today.

He said aerobridges would be built at the terminal to cater for all including the disabled, pregnant women and children.

Bashir said construction work on the project, which began in October 2009, was 42 per cent complete and was estimated to cost between RM3.6 billion and RM3.9 billion.

The dedicated terminal, another landmark of pride located 2km away from the Kuala Lumpur International Airport, will have 68 departure gates.

The KLIA2 will be the world's largest terminal for low cost carriers in the world and an icon in the aviation industry when it opens its doors for business. -- BERNAMA


Read more: KLIA2 to start operations in Apr 2013 - Latest - New Straits Times http://www.nst.com.my/latest/klia2-to-start-operations-in-apr-2013-1.12436#ixzz1fAAy0zsP

Thursday, November 3, 2011

Successful DET-DRST Training of Trainers course held at AirAsia Academy from 17th Oct - 21st Oct,2011


The DET-DRST Training of Trainers course went on smoothly and was a great success! The 5-day training involved a total of 31 participants of various disabilities from 3 countries ie 12 from Thailand, 12 from Indonesia and 7 from Malaysia (PAs included).

The DET-DRST Training of Trainers course was co-organised by BEAT and AIRASIA with the support of JICA. BEAT also had the support of APCD (Thailand) and CBR DTC (Indonesia) which helped coordinate the training team from their respective country.





Tuesday, November 1, 2011

The Official Website of Chief Secretary to The Government of Malaysia


News Highlights







24/10/2011 - Group wants aerobridges at KLIA 2


PETALING JAYA: A group of disabled persons has insisted that the aerobridges were essential at the new KL International Airport 2 (KLIA 2).

About 150 of them gathered at the Taman Jaya Park to make known their stand that the aerobridges were essential for safe boarding and disembarkation of passengers with special needs.

Last month, the Cabinet deferred its decision on the installation of aerobridges at KLIA 2 pending further studies on the matter.

Group spokesman V. Muruges­waran said the long walking distance and ramps leading to the planes were difficult to use and unsafe during bad weather, especially for children, pregnant women and the el-derly.

“We are willing to pay if there is an additional charge for the aerobridges. What we are angry about is that MAHB (Malaysia Airports Hol­dings Bhd) is not even offering the option.

“As an international airport, KLIA 2 surely must have international standard facilities,” said Muruges­waran, who is the president of the Selangor and Federal Territory Da­­mai Handicapped Association.

Beauty consultant Cheong Li Wem, 27, said in line with budget airlines’ “pay for what you use” approach, there should be an option on the use of aerobridges.

“While able-bodied people should be given the option to board with or without an aerobridge, this facility should be made available to the disabled,” she said. 

Wednesday, October 26, 2011







PROPOSAL TO BUILD AEROBRIDGES AT KLIA 2 NOT YET FINALIZED


Video link - http://www.ntv7.com.my/7edition/business-en/PROPOSAL_TO_BUILD_AEROBRIDGES_AT_KLIA_2_NOT_YET_FINALIZED.html


The Malaysian Airports Holdings Berhad, MAHB, has made provisions to install aerobridges at the new low carrier terminal known as KLIA 2.

Deputy Transport Minister Jelaing Mersang told the Dewan Rakyat today that the proposal is still under consideration and will be approved once the airlines decides to use the facility.

He was replying to a question by Seputeh MP Teresa Kok who wanted to know if approvals had been given for the building of aerobridges at KLIA2 and for MAHB to raise the airport fees.

He added that MAHB would raise the airport fees once the aerobridges are installed and used.

MAHB has decided not to install aerobridges at KLIA2 after considering budget carrier AirAsia's decision not to use them, citing cost factors.

If the aerobridges are to be installed, MAHB would have to spend about 132 million ringgit.

Tuesday, October 25, 2011

Group wants aerobridges at KLIA 2



PETALING JAYA: A group of disabled persons has insisted that the aerobridges were essential at the new KL International Airport 2 (KLIA 2).
About 150 of them gathered at the Taman Jaya Park to make known their stand that the aerobridges were essential for safe boarding and disembarkation of passengers with special needs.
Last month, the Cabinet deferred its decision on the installation of aerobridges at KLIA 2 pending further studies on the matter.
Group spokesman V. Muruges­waran said the long walking distance and ramps leading to the planes were difficult to use and unsafe during bad weather, especially for children, pregnant women and the el-derly.
“We are willing to pay if there is an additional charge for the aerobridges. What we are angry about is that MAHB (Malaysia Airports Hol­dings Bhd) is not even offering the option.
“As an international airport, KLIA 2 surely must have international standard facilities,” said Muruges­waran, who is the president of the Selangor and Federal Territory Da­­mai Handicapped Association.
Beauty consultant Cheong Li Wem, 27, said in line with budget airlines’ “pay for what you use” approach, there should be an option on the use of aerobridges.







“While able-bodied people should be given the option to board with or without an aerobridge, this facility should be made available to the disabled,” she said.

Plea for aerobridges at KLIA2



Monday, October 24th, 2011 11:16:00
Aerobridges for all protest
FOR GOOD OF ALL: Disabled protesters demanding for aerobridges at KLIA2 — Pic: Ashraf Shamsul Azlan
PETALING JAYA: About 200 people, comprising both able-bodied and the disabled, yesterday protested against the lack of aerobridges at KL International Airport 2 (KLIA2), which will replace the Low-Cost Carrier Terminal.
The protest, a joint effort by organisations related to the disabled community, was held in Taman Jaya Park as a chance for the disabled to voice their opinions.
Holding up placards and banners, participants chanted "We want aerobridge" and "KLIA2 is for all".
Those disabled said they had the chance to be heard at their protest in Bangsar last month, so the megaphone
was passed on to able-bodied speakers to voice their concerns.
Adam Nicholls, 37, an English tourist visiting Malaysia for the fifth time, said the lack of plans for aerobridges at KLIA2 surprised him.
Gun Chin Yong, 29, said Malaysia could not declare itself a "friendly country" if it lacked facilities not just for locals, but for oversea visitors, especially for those with special requirements such as the disabled, pregnant and elderly.
He said as a volunteer, his experience is for such groups, climbing stairs to board airplanes instead of using an aerobridge is not just inconvenient but dangerous too.
Astivaram Foundation Selangor secretary-general Annaduraimuthusamy, 39, said Malaysia Airport Holdings Berhad (MAHB) should not just think about profit.
Malaysia Tamilan Helping Hands president A. Muraly said said his group was present to request the aerobridge be built.
It is understood the Cabinet has deferred the request for aerobridges after it was tabled on Sept 7.
KLIA2, the replacement to the current Low Cost Carrier Terminal, is expected to be completed in a year and located 1.5km from KLIA.

Sunday, October 23, 2011

“我们需要登机桥”‧200残疾人自愿团体和平请愿


“我们需要登机桥”‧200残疾人自愿团体和平请愿

  • 约200位来自不同团体的弱势人士,要求政府马上在吉隆坡第二国际机场设置登机桥。 (图:星洲日报)
(吉隆坡23日讯)“我们需要登机桥!”约200名弱势群体及自愿团体人士,今早在再也湖滨公园和平请愿,要求大马政府聆听他们的声音,在第二吉隆坡国际机场设立登机桥。
他们来自不同非政府团体,包括无障碍环境与设施团体(BEAT)、雪州与联邦直辖区Damai残障人协会、双福残障自强发展协会、雪隆学习障碍人士自力更生协会(United Voice)、无障碍行动协会(Persatuan Mobiliti)、马来西亚青年基督协会聋哑自助中心(YMCA Majudiri)、大马Tamilan Helping Hands,以及老弱妇孺和志愿人士。
参与请愿行动的不仅是残疾人士,也有婴孩到80岁的老年人和孕妇,他们不分种族开布条,高喊“我们需要登机桥!KLIA2是大家的权利!”的口號。
他们是向大马机场控股公司和政府表达坚决和明確的意愿,即要求第二吉隆坡国际机场设登机桥,以便为残疾人士和老弱人士提供方便。
李秋菊(无障碍环境与设施发言人):交通部表示不能做主
“我们上个月將意愿传递给交通部长江作汉,他很同情我们,然而却不能做主,他表示必须將此课题带到內阁討论和决定,但至今仍未有下文。
我们想藉此机会向政府施压,希望內阁严正看待这个课题,给大家一个答案。”
(星洲日报)

Friday, October 7, 2011

Saturday, October 1, 2011

Wednesday, September 28, 2011

Bank 'humanised'





Facilities installed to aid movement of disabled and elderly folk
Wednesday, September 28th, 2011 15:55:00
Datuk Seri Abdul Wahid Omar
PETALING JAYA: Disabled and elderly-friendly facilities proved to be the main attractions as Malayan Banking Berhad (Maybank) launched its flagship branch at Sunway Giza in Kota Damansara, Petaling Jaya, yesterday.
The branch also signifies Maybank’s new corporate identity, which, in the company's motto, attempts to "humanise financial services".
This was done by installing wheelchair ramps and automatic sliding doors, among others, at the branch, as part of Maybank's efforts to transform its consumer-based banking to be more community-based, thus reaffirming its position as a market leader.
"We have positioned our branches as one-stop centres that can meet all financial needs of the community," said Maybank chief executive officer Datuk Seri Abdul Wahid Omar (pic).
The bank will also host a first-of-its-kind, self-service broker kiosk that allows customers to perform online stockbroking transactions, a helpline that is directly connected to the Maybank Group Customer Care as well as automated teller machines (ATMs) with lower panels.
"A total of 66 branches will be transformed to Maybank's new look during this financial year with five being rolled out next month," said Abdul Wahid.
Among the five would be those in SS2 Petaling Jaya and the City Complex in Jalan Klang Lama.
"Within the next five years, 150 branches will undergo this transformation along with 2,000 touch points," Abdul Wahid said.
Maybank deputy president and head for community financial services Lim Hong Tat said: "We started this transformation programme a year ago and we have trained our staff in that order.
"The intention is to make branches less cluttered, more comfortable and stress-free, coupled with greater service quality."
According to Lim, the renovation costs for each branch was between RM1.2 million and RM 1.8 million, with the whole corporate re-branding cost over the five years estimated to be nearly RM200 million.
Upon touring the new branch, The Malay Mail observed it also offers financial advisers' services with an increased number of counters offering banking advice.
Bank representatives estimate the branch transformations would result in increased revenue worth RM220 million.
Damai Disabled Persons Association of Selangor and Wilayah Persekutuan president V. Murugeswaran was among those who attended the event.


Monday, September 26, 2011

The biggest financial institution in country Maybank setting example for others to follow. Time for the corporate, local and central government to wake-up and do what they promise. Don't just walk and talk



EASIER ACCESS  


2011/09/25 By Dawn Chan  streets@nstp.com.my
A wheelchair-bound customer using a disabled-friendly ATM machine at the Maybank branch at Taman Connaught. — Picture by Aizuddin Saad

A wheelchair-bound customer using a disabled-friendly ATM machine at the Maybank branch at Taman Connaught. — Picture by Aizuddin Saad

Wheelchair-bound customers welcome Maybank’s initiative to introduce disabled-friendly features at some branches

KUALA LUMPUR: Maybank's disabled-friendly branches have made banking easier for the wheelchair bound.

In June last year, Maybank launched several disabled-friendly branches to cater to the needs of their wheelchair-bound customers.

Besides easy accessibility to self-service facilities at specially built ATM and cash deposit machines, there are also designated counters and parking lots, as well as ramps, for the disabled.
The ATM for the disabled is only 73cm high, from floor to keypad.

The area for the disabled-friendly machine is bigger than normal to facilitate a 1.5metre turning radius for customers in wheelchairs.

Some of the machines are also located near the entrance of the bank's self-service terminals.


Some branches have parking lots and ramps for the disabled.

Some branches have parking lots and ramps for the disabled.

Damai Disabled Persons Association of Selangor and Federal Territory (Damai) was approached by Maybank to plan and provide better facilities to cater to the needs of the disabled.

Association president V. Murugeswaran said the issue in the past centred around the inaccessibility of getting into the banks.

"This made it impossible for the disabled to carry out transactions without help from a third party.

"The regular ATMs are too high for those of us in a wheelchair, and if there is someone standing behind us at the ATM, there is no privacy as the person could easily peek at what we are doing."

"We are thankful that Maybank has done a great job and gone the extra mile for us," he said recently.

Murugeswaran said many association members had become Maybank customers because of the disabled-friendly facilities.

Disabled-friendly signages and stickers are also prominently displayed in the banks.

Maybank community financial services deputy president and head Lim Hong Tat said: "We have upgraded some of our branches with specific facilities for disabled customers such as ramps to the entrance, sliding doors to self-service terminal areas as well as special ATM models for wheelchair customers."

The branches that offer disabled-friendly facilities are in Taman Connaught (Cheras), Dataran Maybank (Bangsar), Jalan Bunus (KL city centre), Kuchai Lama, Kepong, and in Bandar Baru Selayang.

In Petaling Jaya, the disabled-friendly outlets are at its main branch in Jalan Sultan, Jalan SS2/63 outlet, and in Subang Perdana.

The disabled-friendly branches outside the Klang Valley are Senawang in Negri Sembilan, Lumut and Sitiawan in Perak, Karamunsing in Sabah, Taman Nusa Bestari in Johor, Jalan Munshi Abdullah in Malacca, as well as Wakaf Siku in Kelantan.

Lim said, besides Damai, the bank also worked with other organisations such as K9 Perwira (a non-governmental organisation in support of people with spinal cord injuries), Society of Disabled People of Sarawak and Sabah Cheshire Home in Kota Kinabalu, on the initiative.

Lim said there was encouraging response from their disabled-friendly branches.

"The feedback indicated our customers are satisfied with the services provided. They have also encouraged us to expand these services to more branches."

Lim said when the bank renovated other branches, they wou


Read more: EASIER ACCESS http://www.nst.com.my/nst/articles/2disabx/Article/#ixzz1ZAmotyqs

Sunday, September 25, 2011

Reconsider decision on aerobridges, MAHB urged

2011/08/20


Members of the group holding up banners to voice their displeasure with Malaysia Airports Holdings Berhad in Kuala Lumpur yesterday. — Picture by Nurul Syazana Rose Razman
KUALA LUMPUR: Nine non-governmental organisations representing the disabled community yesterday urged Malaysia Airports Holdings Berhad (MAHB) to reconsider its decision not to install aerobridges at the Kuala Lumpur International Airport 2.


Representative Christine Lee said the decision was not done in consultation with user groups and had not taken into consideration public opinion.

"MAHB's decision not to include aerobridges is a step backward," she said at a gathering, attended by about 30 disabled people, to express their displeasure over the matter here yesterday.

"If underdeveloped countries can have aerobridges at their airports, why is Malaysia, which is a step away from developed nation status, regressing to third-world infrastructure and service provision?" Lee, who is the Barrier-free Environment and Accessible Transport Organisation coordinator, asked.
She added that aerobridges should and must be made a universal feature in all airport designs.

Damai Disabled Persons Association of Selangor and Federal Territories president V. Murugeswaran, said aerobridges would allow for easier, safer and secure access to boarding and disembarkation of all passengers, especially the disabled community. -- Bernama